Centra State Medical Center

Orange Glitter Texture

Division 03 - Concrete

This section details all new cast-in-place concrete work and related materials.

  • Cast-in-Place Foundations & Slabs:
    Exterior Equipment Pads:
    Furnish and pour new 12" thick turn-down concrete equipment pads, complete with #5 rebar reinforcement in top and bottom layers, placed each way at 12" on center.
    Turn-Down Slabs: Furnish and pour new 8" thick turn-down concrete slabs on grade, complete with #4 rebar reinforcement in top and bottom layers, placed each way at 12" on center.
    Formwork: Provide all necessary formwork, including chamfered edges, for new cast-in-place concrete elements.

  • Concrete Infill & Grouting:
    Precast Plank Infill:
    Furnish and pour 4,000 PSI concrete to infill all new openings in the existing 8" precast concrete plank deck.
    Reinforcement: Provide and place WWM 6x6 W1.4xW1.4 in all concrete infill areas.
    CMU Grouting: Grout all CMU cores solid with 3,000 PSI grout at new lintel bearing locations and wherever post-installed anchors are specified.

  • Reinforcement & Anchoring:
    Rebar:
    Furnish, bend, and place all specified rebar, including proper lap splices and development lengths as per the structural notes on drawing S-001.
    Post-Installed Anchors: Drill and install all specified post-installed anchors using Hilti HY-270 and HY-200-A epoxy adhesives to secure new steel angles and posts to existing concrete and CMU walls.
    Hardware: Provide all associated hardware, including through-bolts, washers, and nuts for the steel connections

Labor Type: Union
Status: Bidding
Bid Due:
September 19, 2025 at 4:00:00 PM
Project ID: 25-050-EST
Contractor: Heritage Renovation

Contact: Maurice Quijano

Phone: (908) 265 8535